Hydroelectric power plant at the mouth of Taroko Gorge on the Liwu River. Originally completed in 1944 by the East Taiwan Electric Power Company (東臺灣電力興業株式會社) as the fourth-largest hydroelectric plant in Taiwan, it was destroyed by a typhoon the same year. Rebuilt with US aid in 1954, it now operates as the Eastern Power Plant Liwu Unit (東部發電廠立霧機組) with a 32 megawatt capacity.
Map
Loading map
Info:
Note: this entry contains only basic information and may be out of date, inaccurate, or even wrong. Additional research is strongly recommended.
說明:本條目僅提供基礎資訊,內容可能過時、未經查證,甚至有誤。建議進一步查閱相關資料,以確認資訊的正確性。
Details
- Status:Private (私有)
- Coordinates:
Links
- Wikipedia in Chinese (中文維基百科)
- Cultural Heritage Map of Taiwan Power Plants (臺灣電廠百年文史地圖)
Themes
- Japanese Colonial Era Taiwan (台灣日治時代)
- KMT Authoritarian Era Taiwan (國民政府時期)
- Energy Industry in Taiwan (台灣能源業)
- US-ROC Alliance Period (中美共同時期)
Backlinks
- Liwu Hydroelectric Power Plant Dormitories (台電立霧發電廠宿舍)
:format(webp)/v/a-synaptic-2025-1.jpg)