The first hydroelectric plant on the Dajia River system, completed during the Japanese colonial era in 1922. Originally known as Sheliaojiao Power Plant (社寮角發電所), it was renamed to its current official designation (大甲溪發電廠社寮機組) in 2001. Still operational as a run-of-river plant drawing water from the Dianhuo Canal (電火圳), with equipment last modernized in 1994. It is not ordinarily open to the public.
Map
Loading map
Info:
Note: this entry contains only basic information and may be out of date, inaccurate, or even wrong. Additional research is strongly recommended.
說明:本條目僅提供基礎資訊,內容可能過時、未經查證,甚至有誤。建議進一步查閱相關資料,以確認資訊的正確性。
Details
- Status:Private (私有)
- Coordinates:
Links
- Wikipedia in Chinese (中文維基百科)
- Cultural Heritage Map of Taiwan Power Plants (臺灣電廠百年文史地圖)
Themes
- Japanese Colonial Era Taiwan (台灣日治時代)
- Energy Industry in Taiwan (台灣能源業)
:format(webp)/v/a-synaptic-2025-1.jpg)