Planned in 1908 and completed in 1911. Japanese colonial era power plant below a ridge in Houli. There is no public access to the site and the building is not readily visible from the roadside.
Map
Recorded On
Links
- Wikipedia in Chinese (中文維基百科)
- Beitoupu Lin Bingyan (北投埔林炳炎)
Themes
- Japanese Colonial Era Taiwan (台灣日治時代)
- Energy Industry in Taiwan (台灣能源業)
:format(webp)/v/a-synaptic-2025-1.jpg)