Inaugurated as the first geothermal power plant in Taiwan in 1981. It closed in 1993 after corrosion of pipes and other issues greatly reduced its output. For many years it was effectively abandoned and often visited by urban explorers. By the mid-2010s the plant was reactivated.
Map
Loading map
Info:
Note: this entry contains only basic information and may be out of date, inaccurate, or even wrong. Additional research is strongly recommended.
說明:本條目僅提供基礎資訊,內容可能過時、未經查證,甚至有誤。建議進一步查閱相關資料,以確認資訊的正確性。
Details
- Status:Private (私有)
- Coordinates:
Links
- Wikipedia in Chinese (中文維基百科)
- Liberty Times (自由時報)
Themes
- Energy Industry in Taiwan (台灣能源業)
:format(webp)/v/a-synaptic-2025-1.jpg)