Inaugurated as the first geothermal power plant in Taiwan in 1981. It closed in 1993 after corrosion of pipes and other issues greatly reduced its output. For many years it was effectively abandoned and often visited by urban explorers. By the mid-2010s the plant was reactivated.
Map
Links
- Wikipedia in Chinese (中文維基百科)
- Liberty Times (自由時報)
Themes
- Energy Industry in Taiwan (台灣能源業)
:format(webp)/v/a-synaptic-2025-1.jpg)